Factory Startup Request
To streamline the startup request process, maximize efficiency, and prevent being dispatched to incomplete or unprepared projects
- Required Documentation
A factory startup cannot be scheduled until the following form is completed in full – Lochinvar Factory Startup Form (All Units)
Forms submitted with missing information will result in scheduling delays
- Submission Instructions
• Save the completed PDF
• Email *completed* form to startups@s15inc.com
• The email Subject Line must contain Project Name
Startup requests are not reviewed or queued until the completed form is received
- !!! DO NOT send or email this form to Lochinvar, we will take care of that for you.!!!
- Scheduling Policy
• Startups are scheduled first‑come, first‑served
• Queue position is based on the arrival of the completed form
• Incomplete forms delay scheduling
- Site Readiness Requirements
The site must be fully prepared before the technician arrives
• All utilities connected and operational
• Venting and combustion air installed correctly
• System piping flushed, filled, and leak‑checked
• Pumps wired, powered, and operational
• Gas lines fully purged
• Construction detritus cleared from equipment and surrounding area
• Units wiped down or blown off with compressed air
• Clear and safe access to all equipment
If the site is not ready, the startup will be rescheduled, and a return trip charge may apply
- BMS Integration
If the project includes BMS integration, a qualified BMS representative must be onsite for the duration of the startup
- Questions
Contact S15 Incorporated at 317‑580‑1515 for clarification or assistance
*All information as shown below is required for each unit.